NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Snowshed Double #1
Killington
Vermont
Status Converted  
Type Chairlift - Double - Fixed  
Brand  
Install Season 1961-62  
New Install?  
Ancestors
Cost   
Install Length 3,495 feet  
Install Vertical 525 feet 
Final Season Standing 1986-87  
Descendants Snowshed Double #1, Killington, VT
Notes Rebuilt by Yan in 1987-88  

The Snowshed doubles (left) circa the 1960s
The Snowshed doubles (left) circa the 1960s

The lift line circa the 1970s
The lift line circa the 1970s

The Snowshed Double 1 (right) circa the 1980s
The Snowshed Double 1 (right) circa the 1980s



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.