NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Upper T-Bar
Jiminy Peak Mountain Resort
Massachusetts
Status Removed  
Type T-Bar  
Brand Constam  
Install Season 1948-49  
New Install? New  
Ancestors
Cost   
Install Length 2,200 feet  
Install Vertical  
Final Season Standing 1977-78  
Descendants
Notes Installation commenced in 1947 but was cancelled due to availability of steel. Installation was completed for 1948-49 season.  

The lift line circa 1948 or 1949
The lift line circa 1948 or 1949

The lift line circa 1948 or 1949
The lift line circa 1948 or 1949

The lift line circa 1948 or 1949
The lift line circa 1948 or 1949

The lift line circa 1948 or 1949
The lift line circa 1948 or 1949

Top terminal construction in 1948
Top terminal construction in 1948

Top terminal construction in 1948
Top terminal construction in 1948

The Upper T-Bar at Jiminy Peak circa the 1950s or 1960s
The Upper T-Bar at Jiminy Peak circa the 1950s or 1960s

The bottom terminal circa the 1950s
The bottom terminal circa the 1950s



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.