NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Double Chair
Mt. Agamenticus
Maine
Status Removed  
Type Chairlift - Double - Fixed  
Brand Mueller  
Install Season 1964-65  
New Install? New  
Ancestors
Cost   
Install Length 2,400 feet  
Install Vertical 470 feet 
Final Season Standing  
Descendants
Notes  

The top terminal circa the 1960s
The top terminal circa the 1960s

The double chair footing in 2007
The double chair footing in 2007

The double chair footing in 2007
The double chair footing in 2007

The double chair top terminal remains in 2007
The double chair top terminal remains in 2007

The double chair footing in 2008
The double chair footing in 2008

The double chair base terminal footing in 2008
The double chair base terminal footing in 2008

The double chair base terminal in 2008
The double chair base terminal in 2008



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.