NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
T-Bar
Mt. Agamenticus
Maine
Status Standing  
Type T-Bar  
Brand  
Install Season 1964-65  
New Install? New  
Ancestors
Cost   
Install Length 1,200 feet  
Install Vertical 180 feet 
Final Season Standing  
Descendants
Notes  

The lift line (1960s)
The lift line (1960s)

The T-Bar top terminal in 2007
The T-Bar top terminal in 2007

The T-Bar top terminal in 2008
The T-Bar top terminal in 2008

A T-Bar tower in 2008
A T-Bar tower in 2008

A T-Bar tower in 2008
A T-Bar tower in 2008

The T-Bar bottom terminal in 2008
The T-Bar bottom terminal in 2008

The T-Bar bottom terminal in 2008
The T-Bar bottom terminal in 2008

The T-Bar bottom terminal in 2008
The T-Bar bottom terminal in 2008

The T-Bar bottom terminal in 2008
The T-Bar bottom terminal in 2008

A tree growing around the bottom T-Bar bullwheel in 2008
A tree growing around the bottom T-Bar bullwheel in 2008



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.