NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Avalanche Double
Mt. Southington
Connecticut
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall-Partek  
Install Season 1969-70  
New Install? New  
Ancestors
Cost   
Install Length 2,069 feet  
Install Vertical 357 feet 
Final Season Standing  
Descendants
Notes Original Hall modified by Partek circa 2011.  

The lift line circa the 1970s
The lift line circa the 1970s

The lift line circa the 1970s
The lift line circa the 1970s

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

A grip (2014)
A grip (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The top terminal (2014)
The top terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Once one of the busiest areas in New England...now idle
Once one of the busiest areas in New England...now idle
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.