NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Sunnyside Double
Waterville Valley Resort
New Hampshire
Status Converted  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1969-70  
New Install? New  
Ancestors
Cost   
Install Length 2,920 feet  
Install Vertical 997 feet 
Final Season Standing 1978-79  
Descendants Sunnyside Triple, Waterville Valley, NH
Northside Double, Waterville Valley, NH
Notes Sunnyside Double upgraded to triple for 1979-80 season  



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.