NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Stardust Triple
Mt. Southington
Connecticut
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Borvig-Partek  
Install Season 1978-79  
New Install? New  
Ancestors
Cost   
Install Length 2,156 feet  
Install Vertical 345 feet 
Final Season Standing  
Descendants
Notes Original Borvig install modified by Partek.  

Installation of the towers in 1978
Installation of the towers in 1978

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

A grip (2014)
A grip (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.