Stardust Triple
Mt. Southington
Connecticut
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Borvig-Partek  
Install Season 1978-79  
New Install? New  
Ancestors
Cost   
Install Length 2,156 feet  
Install Vertical 345 feet 
Final Season Standing  
Descendants
Notes Original Borvig install modified by Partek.  

Installation of the towers in 1978
Installation of the towers in 1978

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

A grip (2014)
A grip (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
Once a large ski area, now defunct
Once a large ski area, now defunct
From a small area to a mega resort
From a small area to a mega resort
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.