NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Little Joe Double
Ski Sundown
Connecticut
Status  
Type Chairlift - Double - Fixed  
Brand Mueller  
Install Season 1994-95  
New Install?  
Ancestors Summit Double, Sundown, CT
Cost $50,000  Hartford Courant
Install Length 450 feet  
Install Vertical 80 feet 
Final Season Standing 2012-13  
Descendants
Notes Original summit double. Likely removed after 2012-13 season and replaced with conveyor lift.  

The Little Joe double chairlift circa the 2000s or early 2010s
The Little Joe double chairlift circa the 2000s or early 2010s

The Little Joe Double in 2003
The Little Joe Double in 2003

The Little Joe Double in 2004
The Little Joe Double in 2004

The Little Joe Double in 2004
The Little Joe Double in 2004



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.