NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Upper Snowdon Poma
Killington
Vermont
Status Partially Standing  
Type Platter  
Brand Poma  
Install Season 1958-59  
New Install? New  
Ancestors
Cost   
Install Length 2,200 feet  
Install Vertical 462 feet 
Final Season Standing 2017-18  
Descendants
Notes  

The Upper Snowdon Poma in 2006
The Upper Snowdon Poma in 2006

The Upper Snowdon Poma in 2006
The Upper Snowdon Poma in 2006

The top terminal (2006)
The top terminal (2006)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2016)
The lift line (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The unloading area (2016)
The unloading area (2016)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.