NewEnglandSkiHistory.com
CT
|
Maine
|
Massachusetts
|
New Hampshire
|
RI
|
Vermont
SkiNewEngland.net
 
New England Ski Lift Database
Morning Star Triple
Okemo Mountain Resort
Vermont
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Poma  
Install Season 1995-96  
New Install?  
Ancestors Northeast Triple, Okemo, VT
Cost   
Install Length 2,692 feet  
Install Vertical 519 feet 
Final Season Standing  
Descendants
Notes Former Northeast triple  

The Morning Star Triple in 2002
The Morning Star Triple in 2002

The Morning Star Triple in 2005
The Morning Star Triple in 2005

The Morning Star Triple in 2005
The Morning Star Triple in 2005

The top terminal (2016)
The top terminal (2016)

The base terminal (2017)
The base terminal (2017)

The base terminal (2017)
The base terminal (2017)

The base terminal (2017)
The base terminal (2017)

A grip (2017)
A grip (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.