Summit Quad
Berkshire East Mountain Resort
Massachusetts
Status Standing  
Type Chairlift - Quad - Fixed  
Brand SkyTrac  
Install Season 2014-15  
New Install? New  
Ancestors
Cost   
Install Length 3,145 feet  
Install Vertical 936 feet 
Final Season Standing  
Descendants
Notes 400 HP Includes ChairKid loading carpet, with line speed of 500 FPM. Lift opened on December 13, 2014.  

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Helicopter installation of the Summit Quad (August 28, 2014)
Helicopter installation of the Summit Quad (August 28, 2014)

Bolting a tower (2014)
Bolting a tower (2014)

Splicing the haul rope (2014)
Splicing the haul rope (2014)

Splicing the haul rope (2014)
Splicing the haul rope (2014)

The haul rope (2014)
The haul rope (2014)

Installing chairs (2014)
Installing chairs (2014)

Installing chairs (2014)
Installing chairs (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

Load More Photos

Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2017, All Rights Reserved.