Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Double
Snow Hill at Eastman
New Hampshire
Status
Removed
Type
Chairlift - Double - Fixed
Brand
Stadeli
Install Season
1972-73
New Install?
New
Ancestors
Cost
Install Length
1,011 feet
Install Vertical
244 feet
Final Season Standing
2000s
Descendants
Notes
The double chair circa the 1980s or 1990s
The double chair line (2003)
The base terminal (2003)
Chairs adjacent to the base terminal (2003)
The base terminal (2003)
The base terminal (2003)
The base terminal (2003)
The double chair (2003)
The double chair (2003)
The double chair (2003)
The double chair (2003)
The double chair (2003)
The top terminal (2003)
The top terminal (2003)
The top terminal (2003)
Also on NewEnglandSkiHistory.com...
The largest ski resort in New England. Almost.
The only high speed quad area in New England to close
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
Will Tenney's lifts spin again?
A 5,000 acre resort with a tram and monorail? Almost.
Topics
Links
What's New
Feedback
Copyright 2002-2023, All Rights Reserved.