NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Lower Chairlift
Pico Mountain
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1962-63  
New Install? New  
Ancestors
Cost $130,000  Berkshire Eagle
Install Length 4,000 feet  
Install Vertical 1,300 feet 
Final Season Standing 1974-75  
Descendants
Notes Possibly replaced with a shorter Hall double in 1975-76.  

The lift line circa the 1960s
The lift line circa the 1960s

The bottom terminal (1960s)
The bottom terminal (1960s)



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
The only high speed quad area in New England to close
The only high speed quad area in New England to close
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.