Rocket
Crotched Mountain New Hampshire
|
Status |
Standing |
Type |
Chairlift - Quad - Detachable |
Brand |
Garaventa-CTEC |
Install Season |
2012-13 |
New Install? |
|
Ancestors |
North Peak Express, Ascutney, VT
|
Cost |
$3,000,000 Ski Area Management |
Install Length |
3,253 feet |
Install Vertical |
884 feet |
Final Season Standing |
|
Descendants |
| Notes |
Opened on December 1, 2012. |
|
|
 The Crotched Rocket in 2012
 Opening day of the Crotched Rocket, December 1, 2012
 The Rocket top terminal in 2013
 The Rocket top terminal in 2013
 The Rocket top terminal in 2013
 The Rocket top terminal in 2013
 The Rocket passing over the second summit quad unloading area in 2013
 The Rocket in 2013
 The Rocket in 2013
 The Rocket base terminal in 2013
 The Rocket base terminal in 2013
 The Rocket base terminal in 2013
 The Rocket base terminal in 2013
 The Rocket base terminal in 2013
 The base terminal (March 2016)
 The base terminal (June 2016)
 Chairs (June 2016)
 The lift line (March 2017)
 A grip (January 2019)
 The top terminal (January 2019)
|
|