NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Discovery Shuttle Triple
Mount Snow
Vermont
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Yan  
Install Season 1998-99  
New Install?  
Ancestors
Cost   
Install Length 365 feet  
Install Vertical 74 feet 
Final Season Standing  
Descendants
Notes  

The Discovery Shuttle Triple top terminal in 2014
The Discovery Shuttle Triple top terminal in 2014

The Discovery Shuttle Triple in 2014
The Discovery Shuttle Triple in 2014

The top terminal (2015)
The top terminal (2015)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

A grip (2016)
A grip (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
The only high speed quad area in New England to close
The only high speed quad area in New England to close
The only Skimobile in New England history
The only Skimobile in New England history
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.