North Chair
Maple Valley Vermont
|
Status |
Standing |
Type |
Chairlift - Double - Fixed |
Brand |
Hall |
Install Season |
1964-65 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
2,743 feet |
Install Vertical |
564 feet |
Final Season Standing |
|
Descendants |
| Notes |
|
|
|
 North Chair in 2002
 North Chair in 2002
 North Chair in 2003
 North Chair in 2003
 North Chair in 2004
 North Chair in 2013
 The bottom terminal (2015)
 The bottom terminal (2015)
 The bottom terminal (2015)
 The bottom terminal (2015)
 The lift line (2015)
 The lift line (2015)
 The lift line (2015)
 The lift line (2015)
 The base terminal (May 2018)
 The base terminal (May 2018)
 The base terminal (May 2018)
 The base terminal (January 2019)
 The lift line (January 2019)
 The base terminal (November 2019)
Load More Photos
|