NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
South Double
Powder Ridge
Connecticut
Status  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1963-64  
New Install? New  
Ancestors
Cost   
Install Length 2,600 feet  
Install Vertical 400 feet 
Final Season Standing 2000-01  
Descendants Middlefield Triple, Powder Ridge, CT
Notes  

The lift line during the Powder Ridge Rock Festival
The lift line during the Powder Ridge Rock Festival



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.