NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Summit Double
Jiminy Peak Mountain Resort
Massachusetts
Status Removed  
Type Chairlift - Double - Fixed  
Brand Mueller  
Install Season 1964-65  
New Install? New  
Ancestors
Cost   
Install Length  
Install Vertical  
Final Season Standing 1982-83  
Descendants Highmount, NY
Notes Sold to Highmount, NY  

The Summit Double circa the mid to late 1960s
The Summit Double circa the mid to late 1960s

The base terminal (left) circa the 1970s
The base terminal (left) circa the 1970s

The Summit Double in the 1970s
The Summit Double in the 1970s

The bottom terminal in 1975
The bottom terminal in 1975

The lift line circa the 1980s
The lift line circa the 1980s

The lift line circa 1980
The lift line circa 1980



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A small community run ski area in Lebanon, NH
A small community run ski area in Lebanon, NH
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.