NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Plaza Chairlift
Bromley Mountain Resort
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Riblet  
Install Season 1965-66  
New Install? New  
Ancestors
Cost   
Install Length 1,920 feet  
Install Vertical 321 feet 
Final Season Standing  
Descendants
Notes  

The bottom terminal (right) circa the mid to late 1960s
The bottom terminal (right) circa the mid to late 1960s

The Plaza Chairlift in 2014
The Plaza Chairlift in 2014

The Plaza Chairlift in 2014
The Plaza Chairlift in 2014

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The top terminal (2018)
The top terminal (2018)

The top terminal (2018)
The top terminal (2018)

A grip (2018)
A grip (2018)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.