New England Ski Lift Database
Big Spruce Double
Stowe Mountain Resort
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Roebling-Poma  
Install Season 1954-55  
New Install? New  
Ancestors
Cost   
Install Length 6,400 feet  
Install Vertical 1,750 feet 
Final Season Standing 2004-05  
Descendants
Notes Modified with Poma double chairs.  

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The base terminal (1960s)
The base terminal (1960s)

The base terminal (1960s)
The base terminal (1960s)

The lift line (January 1971)
The lift line (January 1971)

The top terminal footing (2014)
The top terminal footing (2014)



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.