NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Big Spruce Double
Stowe Mountain Resort
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Roebling-Poma  
Install Season 1954-55  
New Install? New  
Ancestors
Cost   
Install Length 6,400 feet  
Install Vertical 1,750 feet 
Final Season Standing 2004-05  
Descendants
Notes Modified with Poma double chairs.  

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The Big Spruce Double circa the 1950s
The Big Spruce Double circa the 1950s

The base terminal (1960s)
The base terminal (1960s)

The base terminal (1960s)
The base terminal (1960s)

The lift line circa the 1960s
The lift line circa the 1960s

The top terminal footing (2014)
The top terminal footing (2014)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Regaining its Magic
Regaining its Magic
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.