Boulder Chair
Plymouth Notch
Vermont
Status
Partially Standing
Type
Chairlift - Double - Fixed
Brand
Mueller
Install Season
1968-69
New Install?
New
Ancestors
Cost
Install Length
3,200 feet
Install Vertical
700 feet
Final Season Standing
Descendants
Notes
Did not reopen during Bear Creek operations.
The 3,000 Foot Double Chair in 2002
The former bottom terminal (2014)
The former bottom terminal (2014)
The former bottom terminal (2014)
The lift line (2014)
The lift line (2014)
The former bottom terminal (2016)
The former bottom terminal (2017)
The former bottom terminal (2017)
The former bottom terminal (2017)
The lift line (2017)
The lift line (2017)
The lift line (2017)
The lift line (2017)
The lift line (2017)
The top terminal (2017)
The top terminal (2017)
Also on NewEnglandSkiHistory.com...
A monorail served ski area?
The only high speed quad area in New England to close
A classic trail cut by the Civilian Conservation Corps
A ski area built on Massachusetts' highest peak that never opened...
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail? Almost.
Topics
Links
What's New
Feedback
Copyright 2002-2023, All Rights Reserved.