NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Stardust Triple
Mt. Southington
Connecticut
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Borvig-Partek  
Install Season 1978-79  
New Install? New  
Ancestors
Cost   
Install Length 2,156 feet  
Install Vertical 345 feet 
Final Season Standing  
Descendants
Notes Original Borvig install modified by Partek.  

Installation of the towers in 1978
Installation of the towers in 1978

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

A grip (2014)
A grip (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The lift line (2014)
The lift line (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
The only Skimobile in New England history
The only Skimobile in New England history
From a small area to a mega resort
From a small area to a mega resort
A lost ski area with a gondola!
A lost ski area with a gondola!
A small community run ski area in Lebanon, NH
A small community run ski area in Lebanon, NH
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.