NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Monadnock Double
Wachusett Mountain Ski Area
Massachusetts
Status Removed  
Type Chairlift - Double - Fixed  
Brand Doppelmayr  
Install Season 1982-83  
New Install? New  
Ancestors
Cost   
Install Length 2,340 feet  
Install Vertical 290 feet 
Final Season Standing 1998-99  
Descendants Eaglebrook Ski Lift, Easton, MA
Notes 65 HP AC direct drive with hydraulic coupling.  



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
Killington and Pico almost connected
Killington and Pico almost connected
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
A lost ski area with a gondola!
A lost ski area with a gondola!
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.