Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Seven Brothers Triple
Loon Mountain Resort
New Hampshire
Status
Partially Standing
Type
Chairlift - Triple - Fixed
Brand
CTEC
Install Season
1985-86
New Install?
New
Ancestors
Cost
Install Length
3,425 feet
Install Vertical
745 feet
Final Season Standing
2021-22
Descendants
Massif du Sud Regional Park, QC
Notes
Loading carpet added for 2010-11 season. Last day of operation 4/17/2022.
Load Previous 20 Photos
The top terminal (October 2021)
The top terminal (October 2021)
The top terminal (October 2021)
The top terminal (October 2021)
The base terminal (April 17, 2022)
The base terminal (April 17, 2022)
The base terminal (April 17, 2022)
The base terminal (April 17, 2022)
A grip (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The lift line (April 17, 2022)
The top terminal (April 17, 2022)
The base terminal (May 2022)
Load More Photos
Topics
Links
What's New
Feedback
Copyright 2002-2024, All Rights Reserved.