NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Top Flight Quad
Ski Butternut
Massachusetts
Status Standing  
Type Chairlift - Quad - Fixed  
Brand CTEC-Carlevaro & Savio  
Install Season 1993-94  
New Install? New  
Ancestors Sheave Train, Butternut, MA
Cost $750,000  Butternut
Install Length 4,025 feet  
Install Vertical 940 feet 
Final Season Standing  
Descendants
Notes Towers reused from Sheave Train double.  

The Top Flight Quad wreckage after the May 1995 tornado
The Top Flight Quad wreckage after the May 1995 tornado

The Top Flight Quad in 2002
The Top Flight Quad in 2002

The Top Flight Quad in 2003
The Top Flight Quad in 2003

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The bottom terminal (2016)
The bottom terminal (2016)

A grip (2016)
A grip (2016)

A cross arm (2016)
A cross arm (2016)

The lift line (2016)
The lift line (2016)

The top terminal (2016)
The top terminal (2016)

The top terminal (2016)
The top terminal (2016)



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Regaining its Magic
Regaining its Magic
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.