Nitro Express
Mount Snow Vermont
|
Status |
Standing |
Type |
Chairlift - Quad - Detachable |
Brand |
Poma |
Install Season |
1997-98 |
New Install? |
New |
Ancestors |
|
Cost |
|
Install Length |
5,029 feet |
Install Vertical |
992 feet |
Final Season Standing |
|
Descendants |
| Notes |
Also known as the Carinthia Express |
|
|
 Nitro Express in 2002
 Nitro Express in 2005
 Nitro Express in 2006
 Nitro Express in 2006
 Nitro Express in 2006
 Nitro Express in 2006
 The bottom terminal (2015)
 The bottom terminal (2016)
 The bottom terminal (2016)
 A grip (2016)
 A chair (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The top terminal (2016)
|