NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Clipper Ship Quad
Mount Sunapee Resort
New Hampshire
Status Standing  
Type Chairlift - Quad - Fixed  
Brand Poma  
Install Season 2000-01  
New Install? New  
Ancestors
Cost   
Install Length 1,814 feet  
Install Vertical 374 feet 
Final Season Standing  
Descendants
Notes  

The Clipper Ship Quad in 2003
The Clipper Ship Quad in 2003

The Clipper Ship Quad in 2004
The Clipper Ship Quad in 2004

The Clipper Ship Quad in 2014
The Clipper Ship Quad in 2014

The Clipper Ship Quad in 2014
The Clipper Ship Quad in 2014

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The top terminal (2015)
The top terminal (2015)

The top terminal (2015)
The top terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

A chair (2015)
A chair (2015)

A grip (2015)
A grip (2015)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Regaining its Magic
Regaining its Magic
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.