NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Cruiser Quad
Ski Butternut
Massachusetts
Status Standing  
Type Chairlift - Quad - Fixed  
Brand Doppelmayr-CTEC  
Install Season 2005-06  
New Install? New  
Ancestors
Cost   
Install Length 2,078 feet  
Install Vertical 416 feet 
Final Season Standing  
Descendants
Notes  

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (2015)
The bottom terminal (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)

The bottom terminal (2016)
The bottom terminal (2016)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
Killington and Pico almost connected
Killington and Pico almost connected
The only Skimobile in New England history
The only Skimobile in New England history
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.