NewEnglandSkiHistory.com SkiNewEngland.net
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Green Chair
Magic Mountain Ski Area
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Borvig  
Install Season 2018-19  
New Install?  
Ancestors Betwixed Double, Stratton, VT
Cost   
Install Length  
Install Vertical  
Final Season Standing  
Descendants
Notes Construction started on this lift, likely the former Stratton Betwixed Double, in 2003, following the Sun Corner Triple lift line. Initial work included concrete footings and some towers. Incremental construction took place in subsequent years, including work on the base and summit terminals. Construction resumed in 2017. Lift opened 1/5/19.  
Load Previous 20 Photos

Load More Photos
Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
Topics       Links       What's New       Feedback
NewEnglandSkiHistory.com Copyright 2002-2023, All Rights Reserved. SkiNewEngland.net