NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Green Chair
Magic Mountain Ski Area
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Borvig  
Install Season 2018-19  
New Install?  
Ancestors Betwixed Double, Stratton, VT
Cost   
Install Length  
Install Vertical  
Final Season Standing  
Descendants
Notes Construction started on this lift, likely the former Stratton Betwixed Double, in 2003, following the Sun Corner Triple lift line. Initial work included concrete footings and some towers. Incremental construction took place in subsequent years, including work on the base and summit terminals. Construction resumed in 2017. Lift opened 1/5/19.  
Load Previous 20 Photos

The top terminal (2018)
The top terminal (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

The top terminal (December 2019)
The top terminal (December 2019)

The top terminal (December 2019)
The top terminal (December 2019)

The lift line (December 2019)
The lift line (December 2019)

The lift line (December 2019)
The lift line (December 2019)

The lift line (December 2019)
The lift line (December 2019)

The lift line (December 2019)
The lift line (December 2019)

A grip (December 2019)
A grip (December 2019)

The base terminal (December 2019)
The base terminal (December 2019)

The base terminal (November 2019)
The base terminal (November 2019)

The base terminal (November 2019)
The base terminal (November 2019)

The base terminal (November 2019)
The base terminal (November 2019)

The former top terminal (December 2019)
The former top terminal (December 2019)

Opening day (January 5, 2019)
Opening day (January 5, 2019)

Load Previous 20 Photos

Load More Photos

Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
The only high speed quad area in New England to close
The only high speed quad area in New England to close
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Regaining its Magic
Regaining its Magic
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.