CT
|
MA
|
ME
|
NH
|
RI
|
VT
New England Ski Lift Database
High Country T-Bar
Waterville Valley Resort
New Hampshire
Status
Standing
Type
T-Bar
Brand
LST
Install Season
2018-19
New Install?
New
Ancestors
Cost
Install Length
1,670 feet
Install Vertical
397 feet
Final Season Standing
Descendants
Notes
Bottom drive and tension. 88.5 HP, 688 FPM. Construction commenced in 2017. Lift opened on February 16, 2019.
The lift line (July 2017)
The lift line (September 2017)
The top terminal location (September 2017)
Forms (October 2017)
A footing (October 2017)
The top terminal footing (October 2017)
Top terminal form (October 2017)
The base terminal (August 2018)
The base terminal (August 2018)
The base terminal (August 2018)
The lift line (August 2018)
The lift line (August 2018)
The lift line (August 2018)
The lift line (August 2018)
The lift line (August 2018)
The top terminal (August 2018)
The top terminal (August 2018)
The base terminal (September 2018)
The base terminal (August 2018)
The base terminal footing (March 2018)
Load More Photos
Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
The man behind Mount Snow and Mohawk
An area partially constructed near Manchester, NH?
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.