NewEnglandSkiHistory.com SkiNewEngland.net
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Single Chair
Mad River Glen
Vermont
Status Standing  
Type Chairlift - Single - Fixed  
Brand American Steel & Wire Company-Doppelmayr  
Install Season 1948-49  
New Install? New  
Ancestors
Cost $150,000  Milwaukee Journal Sentinel
Install Length 5,234 feet  
Install Vertical 1,972 feet 
Final Season Standing  
Descendants
Notes Partially installed in 1947-48. Dedicated Dec. 11, 1948. 140 HP, 550 FPM, with 23 towers. Rebuilt by Doppelmayr for 2007-08 season (debuting December 6, 2007).  
Load Previous 20 Photos

Load More Photos
Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
West Bowl at Jay Peak?
West Bowl at Jay Peak?
Topics       Links       What's New       Feedback
NewEnglandSkiHistory.com Copyright 2002-2023, All Rights Reserved. SkiNewEngland.net