NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
East Meadow Chairlift
Bromley Mountain Resort
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1974-75  
New Install? New  
Ancestors
Cost   
Install Length 2,140 feet  
Install Vertical 385 feet 
Final Season Standing  
Descendants
Notes Constructed with double-double setup, but second chairlift never constructed.  

The base terminal (2002)
The base terminal (2002)

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The East Meadow Chairlift in 2014
The East Meadow Chairlift in 2014

The base terminal (2018)
The base terminal (2018)

The base terminal (2018)
The base terminal (2018)

A grip (2018)
A grip (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The lift line (2018)
The lift line (2018)

The top terminal (2018)
The top terminal (2018)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
The only Skimobile in New England history
The only Skimobile in New England history
From a small area to a mega resort
From a small area to a mega resort
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2018, All Rights Reserved.