NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Andy's Lift
Brodie Mountain Ski Area
Massachusetts
Status Standing  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1977-78  
New Install? New  
Ancestors
Cost $350,000  Berkshire Eagle
Install Length 4,500 feet  
Install Vertical 950 feet 
Final Season Standing  
Descendants
Notes Named after Jim Kelly's son Andy.  

Construction of the lift (October 1977)
Construction of the lift (October 1977)

Jim Kelly and the control panel (November 1977)
Jim Kelly and the control panel (November 1977)

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

The top of Andy's Lift in 2005
The top of Andy's Lift in 2005

The top of Andy's Lift in 2005
The top of Andy's Lift in 2005

The base terminal (April 2015)
The base terminal (April 2015)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
Once a large ski area, now defunct
Once a large ski area, now defunct
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.