NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Nor'easter Triple
Wachusett Mountain Ski Area
Massachusetts
Status Removed  
Type Chairlift - Triple - Fixed  
Brand Doppelmayr  
Install Season 1983-84  
New Install?  
Ancestors Nor'easter Double, Wachusett, MA
Cost   
Install Length 3,750 feet  
Install Vertical 600 feet 
Final Season Standing 1999-00  
Descendants Monadnock Triple, Wachusett, MA
Notes Nor'Easter Double upgraded to triple for 1983-84 season. 200 HP solid state variable speed drive with 50% downhill capacity.  

The Nor'Easter Triple (1984)
The Nor'Easter Triple (1984)



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
The only high speed quad area in New England to close
The only high speed quad area in New England to close
The only Skimobile in New England history
The only Skimobile in New England history
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
West Bowl at Jay Peak?
West Bowl at Jay Peak?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.