NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Seven Brothers Triple
Loon Mountain Resort
New Hampshire
Status Standing  
Type Chairlift - Triple - Fixed  
Brand CTEC  
Install Season 1985-86  
New Install? New  
Ancestors
Cost   
Install Length 3,425 feet  
Install Vertical 745 feet 
Final Season Standing  
Descendants
Notes  

The top of the Seven Brothers Triple in 2012
The top of the Seven Brothers Triple in 2012

The top terminal (2015)
The top terminal (2015)

The top terminal (April 2016)
The top terminal (April 2016)

The top terminal (April 2016)
The top terminal (April 2016)

The base terminal (December 2017)
The base terminal (December 2017)

The lift line (December 2017)
The lift line (December 2017)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
The only Skimobile in New England history
The only Skimobile in New England history
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.