Outpost Triple
Mount Snow Vermont
|
Status |
Standing |
Type |
Chairlift - Triple - Fixed |
Brand |
Yan-CTEC |
Install Season |
1988-89 |
New Install? |
|
Ancestors |
North Face Double, Mount Snow, VT
|
Cost |
|
Install Length |
3,771 feet |
Install Vertical |
1,022 feet |
Final Season Standing |
|
Descendants |
| Notes |
North Face Double upgraded to triple |
|
|
 Outpost Triple in 2005
 Outpost Triple in 2006
 Outpost Triple in 2007
 Outpost Triple in 2007
 The bottom terminal (2016)
 The bottom terminal (2016)
 A chair (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The lift line (2016)
 The top terminal (2016)
 The top terminal (2016)
 The top terminal (2016)
|
|