NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
American Express
Stratton Mountain Resort
Vermont
Status Standing  
Type Chairlift - Sixpack - Detachable  
Brand Doppelmayr  
Install Season 1995-96  
New Install? New  
Ancestors
Cost   
Install Length 3,238 feet  
Install Vertical 658 feet 
Final Season Standing  
Descendants
Notes  

The American Express in 2013
The American Express in 2013

The bottom terminal (2015)
The bottom terminal (2015)

The bottom terminal (right) (2015)
The bottom terminal (right) (2015)

The top terminal (2015)
The top terminal (2015)

The base terminal (2017)
The base terminal (2017)

The base terminal (2017)
The base terminal (2017)

The base terminal (2017)
The base terminal (2017)

The base terminal (2017)
The base terminal (2017)

A grip (2017)
A grip (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)

The lift line (2017)
The lift line (2017)



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
From Thunder Mountain to Berkshire East
From Thunder Mountain to Berkshire East
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Regaining its Magic
Regaining its Magic
A lost ski area with a gondola!
A lost ski area with a gondola!
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.