NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Pistol Triple
Gunstock Mountain Resort
New Hampshire
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Doppelmayr  
Install Season 2003-04  
New Install?  
Ancestors Summit Triple, Gunstock, NH
Cost   
Install Length 2,677 feet  
Install Vertical 558 feet 
Final Season Standing  
Descendants
Notes  

The Pistol Triple in 2004
The Pistol Triple in 2004

The Pistol Triple in 2004
The Pistol Triple in 2004

The Pistol Triple in 2007
The Pistol Triple in 2007

The Pistol Triple in 2011
The Pistol Triple in 2011

The Pistol Triple in 2011
The Pistol Triple in 2011

The Pistol Triple in 2011
The Pistol Triple in 2011

The Pistol Triple in 2013
The Pistol Triple in 2013

The base terminal (2018)
The base terminal (2018)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.