Peak Triple
Pats Peak New Hampshire
|
Status |
Standing |
Type |
Chairlift - Triple - Fixed |
Brand |
CTEC |
Install Season |
2017-18 |
New Install? |
|
Ancestors |
Snowdance Triple, Ascutney, VT
|
Cost |
$1,000,000 Concord Monitor |
Install Length |
|
Install Vertical |
|
Final Season Standing |
|
Descendants |
| Notes |
Some concrete work completed in 2016.
Includes loading carpet. |
|
|
 Flying in towers (September 2017)
 Base terminal construction (October 2017)
 Base terminal construction (October 2017)
 The top terminal (October 2017)
 Base terminal construction (November 2017)
 The base terminal (2018)
 The base terminal (2018)
 A grip (2018)
 The top terminal (2018)
 The lift line (2018)
 The base terminal (2018)
 The lift line (2018)
 Opening day - JP, Roxy the dog, and Stef - December 16, 2017
 The base terminal (2018)
|
|