NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Presidential Bahn Gondola
Bretton Woods
New Hampshire
Status Standing  
Type Gondola - 8 Person  
Brand Doppelmayr  
Install Season 2019-20  
New Install? New  
Ancestors
Cost   
Install Length 5,861 feet  
Install Vertical 1,298 feet 
Final Season Standing  
Descendants
Notes Construction started in 2018. Lift opened on November 14, 2019. 625 HP, 1181 FPM.  

The future base terminal (August 2018)
The future base terminal (August 2018)

The base terminal (September 2018)
The base terminal (September 2018)

The base terminal (October 2018)
The base terminal (October 2018)

The base terminal (October 2018)
The base terminal (October 2018)

Towers (October 2018)
Towers (October 2018)

Sheave trains (October 2018)
Sheave trains (October 2018)

The base terminal (November 2018)
The base terminal (November 2018)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.