NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Ram's Head Double
Killington
Vermont
Status Removed  
Type Chairlift - Double - Fixed  
Brand Poma  
Install Season 1962-63  
New Install?  
Ancestors
Cost   
Install Length 6,518 feet  
Install Vertical 1,360 feet 
Final Season Standing 1995-96  
Descendants
Notes  

The lift line circa the 1970s
The lift line circa the 1970s

The former Ram's Head Double summit in 2006
The former Ram's Head Double summit in 2006



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
A grand hotel in northern New Hampshire
A grand hotel in northern New Hampshire
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.